Productivity improvement
Series/Report no.:
Ohio State University. Fisher College of Business. Master of Business Operational Excellence Capstone Projects. 2012Abstract:
A manufacturing plant increased top coat equipment labor productivity from \$21.83 per 100 lbs. to \$21.83 per 100 lbs. First pass yield was improved from 87% to 91% by creating problem solving A3's and eliminating the top 3 pareto defects. Equipment uptime increased from 55% to 88% by eliminating key equipment faults and establishing standard work for equipment cleans and change-overs.
Type:
OtherItems in Knowledge Bank are protected by copyright, with all rights reserved, unless otherwise indicated.