OSU Navigation Bar

The Ohio State University University Libraries Knowledge Bank

Corps of Engineers Procedure in the Development of a New Limestone or Dolomite Source

Please use this identifier to cite or link to this item: http://hdl.handle.net/1811/5154

Show full item record

Files Size Format View
V66N02_188.pdf 330.7Kb PDF View/Open

Title: Corps of Engineers Procedure in the Development of a New Limestone or Dolomite Source
Creators: Brewer, James E.
Issue Date: 1966-03
Citation: The Ohio Journal of Science. v66 n2 (March, 1966), 188-191
Abstract: Procedure for approval by the U.S. Army Corps of Engineers of a new source of aggregate is in three phases. Phase 1 consists of an investigation of a quarry or proposed quarry by district geologist and laboratory geologist and/or petrographer. The quarry face or suitable outcrop is logged in detail or, if exposures are poor, cores may be taken to determine whether further investigations are warranted. Phase 2 consists of thorough laboratory testing. Cores and crushed material are subjected to a number of acceptance and quality tests for soundness, absorption, abrasion, reactivity, and other properties. Petrographic analysis is also made. Phase 3 is a physical and economic study of the site and involves determining quantity of stone availavailable, amount and character of overburden, condition of haul roads and distance to rail shipping point, plant flow sheets and capacity, aggregate sizes produced, and approximate price of material at plant.
URI: http://hdl.handle.net/1811/5154
ISSN: 0030-0950
Rights: Reproduction of articles for non-commercial educational or research use granted without request if credit to The Ohio State University and The Ohio Academy of Science is given.
Bookmark and Share